Client: FDOT
Summary: Multi-lane Widening Project – Lighting Design
Detailed Activities:
- Lighting Justification Report – Prepared a lighting justification report.
- Lighting Analysis – Prepared a lighting analysis report detailing design and maintenance options for a complete roadway lighting design.
- I-10 Widening Lighting Design – Currently a lighting design engineer for a 3.0 mile six-lane divided highway, including one bridge and four redesigned ramps. Lighting design included insuring that a safe, aesthetically pleasing lighting design was provided for an expressway design and allowed for transition to existing lighting systems.
S.R. 123 Roadway
Improvement Project
WHAT’S HAPPENING: